CURRENT INFORMATION

Operating information

Available total withdrawals and injections
From
To

Values in the table are only indicative.

Date Total available withdrawal capacity (MWh/day) Total available injection capacity (MWh/day)
23.12.2025 85 014 66 472
22.12.2025 85 014 66 394
21.12.2025 84 874 66 394
20.12.2025 84 596 66 394
19.12.2025 84 769 66 416
18.12.2025 84 719 66 450
17.12.2025 84 671 45 947
16.12.2025 84 671 45 970
15.12.2025 84 771 45 241
Size of contractual withdrawals and injections
From
To

Values in the table are only indicative.

Date Total contractual withdrawal capacity (MWh/day) Total contractual injection capacity (MWh/day)
23.12.2025 75 014 51 472
22.12.2025 75 014 51 394
21.12.2025 75 014 51 394
20.12.2025 75 014 51 394
19.12.2025 75 237 51 416
18.12.2025 75 237 51 450
17.12.2025 75 237 30 947
16.12.2025 75 237 30 970
15.12.2025 75 237 30 241
Interrupted interruptible throughput and price
From
To
Date Withdrawals (MWh/day) Injections (MWh/day) Price
22.12.2025 0 0 0
Size of interrupted firm storage capacity
From
To
Date Withdrawals (MWh/day) Injections (MWh/day)
22.12.2025 0 0
Current capacity in the virtual storage facility and actual daily injection and withdrawal values
From
To
Date Current capacity in MWh Withdrawals (MWh/day) Injections (MWh/day)
22.12.2025 2 439 371 34 779 495
Storage capacity
Year Total technical capacity (mil. m3) Contracted capacity (mil. m3)  Free capacity (mil. m3)
2020 320 320 0
2019 330 330 0
2018 280 280 0
2017 280 280 0
2016 225 255 0
2015 245 245 0
2014 235 235 0
2013 225 225 0
2012 215 215 0
ZP development – capacity and throughput
 Year  Operating volume (mil. m3)  Max. contractual withdrawals mil. m3/day     Max. contractual withdrawals MWh/day Max. contractual injections mil. m3/day   Max. contractual injections MWh/day
 
2025 335 9,0 96 000 5,5 59 000
2024 330 9,0  96000 5,5 59 000
2023 325 9,0 96 000 5,5 59 000
2022 320 9,0 96 000 5,5 59 000
2021 320 10,0 107 000 5,5 59 000
2020 320 10,8 115 000 6,0 64 000
2019 330 12,0 127 000 6,2 67 000
2018 280 10,1 107 207 5,4 57 666
2017 280 10,1 107 207 5,4 57 666
2016 255 10,1 107 111 5,4 57 370
2015 245 9,1 96 678 5,1 54 182
2014 235 8,7 92 429 4,5 47 808
2013 225 8,2 87 117 4,0 42 496
2012 215 7,7 81 805 3,5 37 184
2011 160 4,8 50 995 2,7 28 685
2010 180 6,0 63 744 2,4 25 498
Shutdowns and maintenance
Shutdown date  Reduction in daily storage during the shutdown in %  Type of shutdown Note 
   Daily injections Daily withdrawals   
12. 9. – 25. 9. 2022 100% 100% plánovaná Pravidelná údržba ZP Uhřice
13.9 - 26.9.2021  100% 100% plánovaná Pravidelná údržba ZP Uhřice
30. - 31.8.2021 100% 100% plánovaná Odstávka MS Brumovice – testování bezpečnostních sekvencí
14. – 22. 9. 2020 100% 100% plánovaná Údržba zařízení TSO (Net4Gas), oprava plynovodu DN 700 RU Mutěnice – TU Diváky
14.9. – 27.9.2020 100% 100% plánovaná Pravidelná údržba ZP Uhřice
3.6. – 16.6.2019 100% 100% plánovaná Pravidelná údržba ZP Uhřice
30.10.2018, 1.11.2018 50% 50% plánovaná Odstávka zařízení N4G (čištění plynovodu DN 700 RU Mutěnice – PRS V.Němčice)
13.9.2018, 20.9.2018 17% 17% plánovaná Odstávka zařízení N4G (čištění plynovodu DN 700 RU Mutěnice – PRS V.Němčice)
10.9.2018 – 23.9.2018 100% 100% plánovaná

Pravidelná údržba ZP Uhřice

30.10.2017 – 12.11.2017 100% 100% plánovaná

Údržba MS Brumovice

Date Denní pevný výkon Denní přerušitelný výkon
Vtláčení Těžba Vtláčení Těžba
23.12.2025 N/A N/A 10 000 000 -5 000 000
24.12.2025 5 000 000 -5 000 000 10 000 000 -5 000 000
25.12.2025 5 000 000 -5 000 000 10 000 000 -5 000 000